海翔航务是一家2009年组建的航务工程施工企业

专业从事码头、防波堤、护岸、堆场道路、船坞、船闸、水下地基及基础、土石方、人工岛、河海航道整治、水下炸礁等港口与航道工程。

福清核电5、6号机组CC跌落井工程及排水暗渠建安工程

【概要描述】本项目包含南护堤拆除、恢复、胸墙、越浪雨水沟、防海水倒灌钢闸门等项目。2016年5月到18年3月工期近2年。
Fuqing Nuclear Power Plant Unit 5 and Unit 6 CC Syphon Well & Outfall Culvert Construction and Installation Project
This project includes the demolition and restoration of the south dike, the breast wall, the wave overtopping rain gutter, and the steel gate for preventing seawater backflow. The construction period takes nearly 2 years, from May 2016 to March 18.

福清核电5、6号机组CC跌落井工程及排水暗渠建安工程

【概要描述】本项目包含南护堤拆除、恢复、胸墙、越浪雨水沟、防海水倒灌钢闸门等项目。2016年5月到18年3月工期近2年。
Fuqing Nuclear Power Plant Unit 5 and Unit 6 CC Syphon Well & Outfall Culvert Construction and Installation Project
This project includes the demolition and restoration of the south dike, the breast wall, the wave overtopping rain gutter, and the steel gate for preventing seawater backflow. The construction period takes nearly 2 years, from May 2016 to March 18.

  • 分类:核电站工程
  • 作者:
  • 来源:
  • 发布时间:2021-11-06
  • 访问量:0

本项目包含南护堤拆除、恢复、胸墙、越浪雨水沟、防海水倒灌钢闸门等项目。2016年5月到18年3月工期近2年。
Fuqing Nuclear Power Plant Unit 5 and Unit 6 CC Syphon Well & Outfall Culvert Construction and Installation Project
This project includes the demolition and restoration of the south dike, the breast wall, the wave overtopping rain gutter, and the steel gate for preventing seawater backflow. The construction period takes nearly 2 years, from May 2016 to March 18.

 

预制涵管

 

 

钢筋捆扎

 

 

米底板大体积砼浇筑

 

 

顶板浇筑

 

 

CC跌落井顺利封顶

 

 