江苏田湾核电站3、4号机组取水明渠拦污网漂浮物打捞工程
- 分类:核电站工程
- 作者:小编
- 来源:
- 发布时间:2021-09-07
【概要描述】本工程为漂浮物打捞、拦污网设计施工图范围内全部土建及安装工程、设备安装及调试工程。施工区域基础开挖(包括原堤心石开挖)、施工后至扭王字块安装前所有回填及坡面整平(理坡)工作等。2018-11-30竣工,工期一年多。
Jiangsu Tianwan Nuclear Power Plant Unit 3 & 4 Water Intake Open Channel Trash-holding Facility Flotsam Removal Works
This project includes all civil works and erection works, equipment installation and commissioning works within the scope of the construction drawings of the floatage elimination and the trash holding net. Foundation excavation of the construction area (including the excavation of the original embankment core stone), all backfilling and slope leveling (slope making) work from after construction and before the installation of the accropode blocks. The project was completed on Nov. 30th, 2018, with a completion period of more than one year.
江苏田湾核电站3、4号机组取水明渠拦污网漂浮物打捞工程
【概要描述】本工程为漂浮物打捞、拦污网设计施工图范围内全部土建及安装工程、设备安装及调试工程。施工区域基础开挖(包括原堤心石开挖)、施工后至扭王字块安装前所有回填及坡面整平(理坡)工作等。2018-11-30竣工,工期一年多。
Jiangsu Tianwan Nuclear Power Plant Unit 3 & 4 Water Intake Open Channel Trash-holding Facility Flotsam Removal Works
This project includes all civil works and erection works, equipment installation and commissioning works within the scope of the construction drawings of the floatage elimination and the trash holding net. Foundation excavation of the construction area (including the excavation of the original embankment core stone), all backfilling and slope leveling (slope making) work from after construction and before the installation of the accropode blocks. The project was completed on Nov. 30th, 2018, with a completion period of more than one year.
- 分类:核电站工程
- 作者:小编
- 来源:
- 发布时间:2021-09-07
- 访问量:0
本工程为漂浮物打捞、拦污网设计施工图范围内全部土建及安装工程、设备安装及调试工程。施工区域基础开挖(包括原堤心石开挖)、施工后至扭王字块安装前所有回填及坡面整平(理坡)工作等。2018-11-30竣工,工期一年多。
Jiangsu Tianwan Nuclear Power Plant Unit 3 & 4 Water Intake Open Channel Trash-holding Facility Flotsam Removal Works
This project includes all civil works and erection works, equipment installation and commissioning works within the scope of the construction drawings of the floatage elimination and the trash holding net. Foundation excavation of the construction area (including the excavation of the original embankment core stone), all backfilling and slope leveling (slope making) work from after construction and before the installation of the accropode blocks. The project was completed on Nov. 30th, 2018, with a completion period of more than one year.
鸟瞰图
打捞码头全景
墩台桩施工
拦污网墩台
码头预制方块安装
地址:浙江省宁波市高新区光华路299号研发园二期C6-8楼 电话:+86-0574-87995224 邮箱:zjhaixiang@163.com
©2009 CEDESIGN. zjhxhw.com All Rights Reserved.版权所有 浙ICP备2021028790号-1 ©2009 - 2021 浙江海翔航务工程有限公司